ARABI KSA

Sewage treatment plant expansion

Brief Description of project: Expansion of the existing Sewage Treatment System from treating 313 cubic meters to 939 cubic meters per day and to provide an effluent holding tank to hold the effluent water for the truck filling purpose and an expansion of Truck fill station. Also, construction of a new lift station at south yard and installation of sewer piping to transfer the sewage water from south yard area to the existing brown stone lift station.

Project Information

Client

United States Armed Corps of Engineers (USACE)

Location

Ali Al Salem Air Base

Year

2020

Amount

$ 2,468,000.00